Elevated Steel Structure for Garment Production Expansion
Projects Description
IBS (PVT) Ltd. designed and constructed a PEB shed on the 3rd floor of an existing garments facility at Al-Karam Textile in Karachi. The structure was custom-engineered to be lightweight yet durable, allowing for safe installation over an operational building. Roof and wall cladding were completed using 0.5mm thick PPGI sheets. The project was delivered with precision and minimal disruption, supporting the client’s need to expand production vertically.
Projects Information
Structure Type: Elevated PEB Shed
Scope: Civil, Mechanical, Electrical
Covered Area: 27,300 Sq. Ft.
Location: Karachi
Timeline: Delivered on time under turnkey contract